Bulk Fuel Storage Site

Industrial

Union County, Arkansas · MISO

DC Readiness
41.7
Fair / 100

Bulk Fuel Storage Site is a industrial datacenter candidate site in Union County, Arkansas, interconnecting through MISO. It screens at 41.7/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth161

Connectivity

Nearest IXPARE-ON Hope
IXP distance63.0 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterARE-ON Hope
DC distance63.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.74¢/kWh
Industrial electricity7.18¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$2,912

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Union County, ranked by DC Readiness.

Sites near Bulk Fuel Storage Site
SiteTypeVoltageCapacityQueue waitScore
UNION POWER STATIONSubstation-Adjacent500 kV1,000 MW1.4 yrs70.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs64.3
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs64.2
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs63.9
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs63.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs63.6
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs63.0
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Bulk Fuel Storage Site, Union County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.