Bulk Fuel Storage Site
IndustrialUnion County, Arkansas · MISO
At a glance
Bulk Fuel Storage Site is an industrial datacenter candidate site in Union County, Arkansas, scoring 47.4/100 DC Readiness — 26th of 28 scored sites in the county. It sits in the MISO grid region and the ENTERGY ARKANSAS LLC service territory, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Site location
Get alerts
Track Bulk Fuel Storage Site
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Bulk Fuel Storage Site compare with other sites in Union County?
Bulk Fuel Storage Site ranks 26th of 28 scored candidate sites in Union County. Its 47.4/100 is about 11% below the county average of 53.2. It is about 12% below the Arkansas average of 53.6 and about 11% below the national average of 53.2.
Against the Arkansas average, its strongest sub-score is natural hazard (62 vs 61) and its weakest is power availability (30 vs 42). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Bulk Fuel Storage Site to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is ARE-ON Hope at 63 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is ARE-ON Hope, 63 miles away.
What are the flood, water and hazard risks at Bulk Fuel Storage Site?
At the county level, FEMA's National Risk Index rates Union County "Relatively High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Union County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN117211 | Substation-Adjacent | 500 kV | 1,000 MW | 4.3 yrs | 61.8 |
| OZ Union | Greenfield | — | — | 4.3 yrs | 56.7 |
| EC FFE Union County | Greenfield | — | — | 4.3 yrs | 56.3 |
| UNKNOWN107828 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.1 |
| UNKNOWN121607 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.1 |
| UNKNOWN107835 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.1 |
| UNKNOWN107830 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.1 |
| UNKNOWN107837 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 54.1 |
Bulk Fuel Storage Site: common questions
What is the DC Readiness score of Bulk Fuel Storage Site?
Bulk Fuel Storage Site scores 47.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 26th of 28 scored sites in Union County. The Union County average is 53.2 and the Arkansas average is 53.6.
Which electric utility serves Bulk Fuel Storage Site?
ENTERGY ARKANSAS LLC (investor owned) holds the retail service territory that contains the site; its holding company is ENTERGY CORP.
What grid region is Bulk Fuel Storage Site in?
Bulk Fuel Storage Site is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Bulk Fuel Storage Site from an internet exchange?
The nearest internet exchange facility is ARE-ON Hope, about 63 miles away; 6 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Bulk Fuel Storage Site, Union County, AR”, https://gridcensus.com/datacenter-sites/arkansas/union-county/bulk-fuel-storage-site-c5eac8f9 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Bulk Fuel Storage Site, Union County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.