YUCCA is a substation-adjacent datacenter candidate site in Imperial County, Arizona, interconnecting through WECC. It screens at 49.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationYUCCA
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityARIZONA PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPBorder Crossing Pop 1
IXP distance135.4 mi
Fiber providers4
Fiber coverage8.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score52/100

Location context

Nearest datacenterBorder Crossing Pop 1
DC distance135.4 mi
County hazard (FEMA NRI)Relatively High (48)
DC tax incentiveNo
Commercial electricity19.28¢/kWh
Industrial electricity18.95¢/kWh
Cooling degree days1,000
Heating degree days2,500
Land price / acre$11,892

Regulatory climate

Restrictivestate posture · as of 2026-08

Sales-tax exemption suspended Jul 2026–Jun 2029; water constraints add scrutiny.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track YUCCA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
56
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
24
Natural hazard6%
52
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
34
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Imperial County, ranked by DC Readiness.

Sites near YUCCA
SiteTypeVoltageCapacityQueue waitScore
IMPERIAL VALLEYSubstation-Adjacent500 kV1,000 MW8.2 yrs54.5
Heber GeothermalBrownfield66 kV59 MW5.7 yrs54.3
IMPERIAL VALLEYSubstation-Adjacent500 kV1,000 MW8.2 yrs54.1
UNKNOWN301886Substation-Adjacent345 kV600 MW8.2 yrs52.7
Hudson Ranch Power II LLCBrownfield230 kV55 MW5.7 yrs52.1
EL CENTROSubstation-Adjacent230 kV300 MW8.2 yrs51.3
Ormesa IBrownfield66 kV31 MW5.7 yrs50.1
HIGHLINESubstation-Adjacent230 kV300 MW8.2 yrs50.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for YUCCA, Imperial County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.