Northwest Arctic, Alaska · SERC

DC Readiness
48.7
Fair / 100

KOTZEBUE is a federal excess datacenter candidate site in Northwest Arctic, Alaska, interconnecting through SERC. It screens at 48.7/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

UtilityALASKA VILLAGE ELEC COOP, INCcooperativerestrictive to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Fiber providers2
Fiber coverage7.2%

Site characteristics

Acreage140 ac
Buildable load (est.)~56–140 MWland-based
Land contactNorthwest Arctic County County Assessor
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score82/100

Location context

County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity55.18¢/kWh
Cooling degree days0
Heating degree days10,000
Land price / acre$20,972

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track KOTZEBUE

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
72
Fiber connectivity12%
9
Energy cost10%
50
Water risk7%
96
Natural hazard6%
82
Buildability7%
50
Labor market4%
50
DC cluster4%
10
Land / acreage3%
68
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Northwest Arctic, ranked by DC Readiness.

Sites near KOTZEBUE
SiteTypeVoltageCapacityQueue waitScore
KOTZEBUEFederal Excess——1.0 yrs48.7
Mine SiteFormer Mine——3.5 yrs48.6
Selawik IRA Fuel Project Former Tank FarmIndustrial——3.5 yrs48.5
OZ Northwest ArcticGreenfield——3.5 yrs48.5
Selawik Former School Tank Farm and Storage PadIndustrial——3.5 yrs48.5
Selawik Old AVEC Tank FarmIndustrial——3.5 yrs48.5
Kobuk Abandoned Tank FarmIndustrial——3.5 yrs48.4
Mine SiteFormer Mine——3.5 yrs48.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for KOTZEBUE, Northwest Arctic is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.