Matanuska-Susitna County, Alaska · SERC

DC Readiness
54.6
Fair / 100

TALKEETNA is a federal excess datacenter candidate site in Matanuska-Susitna County, Alaska, interconnecting through SERC. It screens at 54.6/100 DC Readiness and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

UtilityMATANUSKA ELECTRIC ASSN INCcooperativerestrictive to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPACS North Wire Center
IXP distance75.6 mi
Fiber providers4
Fiber coverage33.6%

Site characteristics

Acreage64 ac
Buildable load (est.)~26–64 MWland-based
Former useNavigation and Traffic Aids

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score82/100

Location context

Nearest datacenterACS North Wire Center
DC distance75.6 mi
County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity22.55¢/kWh
Industrial electricity20.37¢/kWh
Cooling degree days0
Heating degree days10,000
Land price / acre$20,972

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TALKEETNA

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
71
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
96
Natural hazard6%
82
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
58
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Matanuska-Susitna County, ranked by DC Readiness.

Sites near TALKEETNA
SiteTypeVoltageCapacityQueue waitScore
DOUGLASSubstation-Adjacent138 kV100 MW3.5 yrs57.5
BIG LAKEFederal Excess——1.0 yrs56.7
UNKNOWN158475Substation-Adjacent138 kV100 MW3.5 yrs56.4
ALASKAFederal Excess——1.0 yrs55.0
TALKEETNAFederal Excess——1.0 yrs54.8
Mine SiteFormer Mine——3.5 yrs54.3
Mine SiteFormer Mine——3.5 yrs53.9
Mine SiteFormer Mine——3.5 yrs53.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.