Future Millenium Square Development

Industrial

Kenai Peninsula County, Alaska

DC Readiness
38.4
Limited / 100

Future Millenium Square Development is a industrial datacenter candidate site in Kenai Peninsula County, Alaska. It screens at 38.4/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPAlasConnect Data Center 5
IXP distance63.0 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterAlasConnect Data Center 5
DC distance63.0 mi
County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity23.06¢/kWh
Industrial electricity13.02¢/kWh
Cooling degree days0
Heating degree days10,000
Land price / acre$5,828

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Kenai Peninsula County, ranked by DC Readiness.

Sites near Future Millenium Square Development
SiteTypeVoltageCapacityQueue waitScore
Tesoro Kenai Cogeneration PlantBrownfield8 MW59.4
UNKNOWN158524Substation-Adjacent115 kV100 MW3.5 yrs58.8
NEW STERLINGSubstation-Adjacent115 kV100 MW3.5 yrs57.8
BERNICESubstation-Adjacent115 kV100 MW3.5 yrs57.3
UNKNOWN158460Substation-Adjacent115 kV100 MW3.5 yrs57.1
SOLDOTNASubstation-Adjacent115 kV100 MW3.5 yrs57.0
TAP158519Substation-Adjacent115 kV100 MW3.5 yrs56.8
UNKNOWN158483Substation-Adjacent115 kV100 MW3.5 yrs56.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.