Greenfield (PLANT GASTON - LEEDS)

Greenfield

Shelby County, Alabama · SERC

DC Readiness
59.5
Good / 100

At a glance

Greenfield (PLANT GASTON - LEEDS) is a greenfield datacenter candidate site in Shelby County, Alabama, scoring 59.5/100 DC Readiness — 33rd of 82 scored sites in the county. Its nearest substation is PLANT GASTON. It sits in the SERC grid region and the ALABAMA POWER CO service territory, where interconnection has averaged 3.9 years from request to operation. GridCensus catalogs 300 MW of candidate capacity here.

Power & interconnection

Nearest substationPLANT GASTON
Substation voltage230 kV
Available capacity300 MW
UtilityALABAMA POWER COinvestor ownedfavorable to large load · terms ≥ 100 MW

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPDC BLOX BHM1 - DCBLOX Birmingham
IXP distance14.7 mi
Fiber providers7
Fiber coverage76.5%

Site characteristics

Site typeGreenfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterDC Blox Data Center
DC distance14.7 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.95¢/kWh
Industrial electricity8.60¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$5,118

Regulatory climate

Moderatestate posture · as of 2026-08

Incentives available; PSC review for very large loads.

DC tax incentiveYes
Large-load threshold≥ 150 MW

Alabama PSC review threshold for large loads.

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Greenfield (PLANT GASTON - LEEDS)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Greenfield (PLANT GASTON - LEEDS) compare with other sites in Shelby County?

Greenfield (PLANT GASTON - LEEDS) ranks 33rd of 82 scored candidate sites in Shelby County. Its 59.5/100 is roughly in line with the county average of 57.8. It is roughly in line with the Alabama average of 55.0 and about 12% above the national average of 53.2.

Against the Alabama average, its strongest sub-score is fiber connectivity (84 vs 66) and its weakest is speed to power (58 vs 58). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Greenfield (PLANT GASTON - LEEDS) to power, fiber and other datacenters?

The nearest mapped substation, PLANT GASTON, is the closest grid connection point on record and operates at 230 kV. For connectivity, the nearest internet exchange facility is DC BLOX BHM1 - DCBLOX Birmingham at 14.7 miles. 7 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DC Blox Data Center, 14.7 miles away.

What are the flood, water and hazard risks at Greenfield (PLANT GASTON - LEEDS)?

At the county level, FEMA's National Risk Index rates Shelby County "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power20%
58
Fiber connectivity12%
84
Energy cost10%
50
Water risk7%
92
Natural hazard6%
55
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
20

Nearby comparable sites

Other scored datacenter candidate sites in Shelby County, ranked by DC Readiness.

Sites near Greenfield (PLANT GASTON - LEEDS)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109262Substation-Adjacent230 kV300 MW3.9 yrs66.0
UNKNOWN109268Substation-Adjacent230 kV300 MW3.9 yrs65.7
EAST PELHAMSubstation-Adjacent230 kV300 MW3.9 yrs65.1
PLANT GASTONSubstation-Adjacent230 kV300 MW3.9 yrs63.8
UNKNOWN111717Substation-Adjacent115 kV100 MW3.9 yrs61.9
TAP142659Substation-Adjacent115 kV100 MW3.9 yrs61.7
UNKNOWN111719Substation-Adjacent115 kV100 MW3.9 yrs61.7
TAP142649Substation-Adjacent115 kV100 MW3.9 yrs61.6

Greenfield (PLANT GASTON - LEEDS): common questions

What is the DC Readiness score of Greenfield (PLANT GASTON - LEEDS)?

Greenfield (PLANT GASTON - LEEDS) scores 59.5/100 on the GridCensus DC Readiness scale, rated good. It ranks 33rd of 82 scored sites in Shelby County. The Shelby County average is 57.8 and the Alabama average is 55.0.

What is the nearest substation to Greenfield (PLANT GASTON - LEEDS)?

The nearest mapped substation is PLANT GASTON, at 230 kV. GridCensus catalogs 300 MW of candidate capacity for the site.

Which electric utility serves Greenfield (PLANT GASTON - LEEDS)?

ALABAMA POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is SOUTHERN COMPANY.

What grid region is Greenfield (PLANT GASTON - LEEDS) in?

Greenfield (PLANT GASTON - LEEDS) is in the SERC region. Projects interconnecting there have averaged a 3.9-year wait from queue request to operation.

How far is Greenfield (PLANT GASTON - LEEDS) from an internet exchange?

The nearest internet exchange facility is DC BLOX BHM1 - DCBLOX Birmingham, about 14.7 miles away; 7 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Greenfield (PLANT GASTON - LEEDS), Shelby County, AL”, https://gridcensus.com/datacenter-sites/alabama/shelby-county/greenfield-plant-gaston-leeds-49770030 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Greenfield (PLANT GASTON - LEEDS), Shelby County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.