Green Bay, Brown, Wisconsin · Wisconsin Public Service Corp

Legacy capacity
580
MW

Pulliam is a coal plant in Green Bay, Brown, Wisconsin, retired 2018-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 580 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity580 MW
Retirement date2018-10-01
EIA plant ID#4072

Grid hookup & remediation

Nearest substation0.1 mi
Operator address1530 N Bylsby Av, Green Bay, WI, 54303
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Brown County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)139,570
Construction employment7,644
Land value$9,088/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate11.66¢/kWh
Industrial power rate7.57¢/kWh
Load growth (FERC-714)0.6%

Water & cooling

Water stressLow
Public water supply19.2 MGD
Industrial water use61.9 MGD
Cooling degree days600
Mean annual temp44°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers12 · 59% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Pulliam — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Consumer Operations LLCcoal plant1163.4 mi—
Kimberly Millnatural gas plant3524.3 mi—
Oneida Casinooil plant46.6 mi—
New Badgerformer hydro site422.2 mi—
Old Badgerformer hydro site222.2 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Pulliam

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Pulliam, ranked by DC Readiness.

Candidate sites near Pulliam
SiteTypeStateCountyVoltageCapacityQueue waitScore
FOX RIVER STATIONSubstation-AdjacentWIOutagamie County345 kV600 MW2.8 yrs67.5
NORTH APPLETONSubstation-AdjacentWIOutagamie County345 kV600 MW2.8 yrs67.0
FOREST JUNCTIONSubstation-AdjacentWICalumet County345 kV600 MW2.8 yrs66.2
PULLIAM SW YDSubstation-AdjacentWIBrown County138 kV100 MW2.8 yrs65.9
EC Near Kimberly MillGreenfieldWIOutagamie——1.4 yrs65.4
EC Near Oneida CasinoGreenfieldWIBrown——1.4 yrs65.3
EC Near Oneida CasinoGreenfieldWIBrown——1.4 yrs64.5
BRANCH RIVERSubstation-AdjacentWIManitowoc County345 kV600 MW2.8 yrs64.0

Nearby internet exchanges

See all datacenter sites in Wisconsin →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Pulliam, Green Bay, Brown, Wisconsin. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.