Lake Area Landfill Gas Recovery

Brownfield

Sarona, Washburn, Wisconsin · Dairyland Power Coop

Legacy capacity
3
MW

Lake Area Landfill Gas Recovery is a natural gas plant in Sarona, Washburn, Wisconsin. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity3 MW
EIA plant ID#56366

Grid hookup & remediation

Nearest substation9.3 mi
OperatorDairyland Power Coop
Operator addressW5987 County Rd D, Sarona, WI, 54870
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Lake Area Landfill Gas Recovery, ranked by DC Readiness.

Candidate sites near Lake Area Landfill Gas Recovery
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN139715Substation-AdjacentWIWashburn County161 kV100 MW1.4 yrs68.9
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWIWashburn County345 kV600 MW1.4 yrs67.1
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWISawyer County345 kV600 MW1.4 yrs66.8
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWISawyer County345 kV600 MW1.4 yrs66.2
UNKNOWN139699Substation-AdjacentWIWashburn County161 kV100 MW1.4 yrs66.1
UNKNOWN107655Substation-AdjacentWIBarron County161 kV100 MW1.4 yrs63.7
TAP163061Substation-AdjacentWIWashburn County161 kV100 MW1.4 yrs63.2
TAP163059Substation-AdjacentWIWashburn County161 kV100 MW1.4 yrs62.9

See all datacenter sites in Wisconsin

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.