Eagle River
BrownfieldEagle River, Vilas, Wisconsin · Wisconsin Public Service Corp
Eagle River is a oil plant in Eagle River, Vilas, Wisconsin, retired 2011-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 4 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Eagle River, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| METONGA | Substation-Adjacent | WI | Forest County | 115 kV | 100 MW | 1.4 yrs | 65.9 |
| ST GERMAIN | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 64.4 |
| RISER139530 | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 64.1 |
| ST GERMAIN | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 63.9 |
| TAP138648 | Substation-Adjacent | WI | Vilas County | 138 kV | 100 MW | 1.4 yrs | 63.7 |
| THREE LAKES | Substation-Adjacent | WI | Oneida County | 115 kV | 100 MW | 1.4 yrs | 63.3 |
| Eagle River | Brownfield | WI | Vilas | — | 4 MW | — | 62.9 |
| CLEAR LAKES (WPS) | Substation-Adjacent | WI | Oneida County | 115 kV | 100 MW | 1.4 yrs | 62.6 |
See all datacenter sites in Wisconsin →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Eagle River, Eagle River, Vilas, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.