Barron
BrownfieldBarron, Barron, Wisconsin · City of Barron - (WI)
Barron is a oil plant in Barron, Barron, Wisconsin, retired 2024-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 8 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Barron, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OZ Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 62.8 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 62.0 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 60.6 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 60.1 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 60.0 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 59.7 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 59.6 |
| EC Near Barron | Greenfield | WI | Barron | — | — | 1.4 yrs | 58.6 |
See all datacenter sites in Wisconsin →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Barron, Barron, Barron, Wisconsin. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.