FirstEnergy Rivesville

Brownfield

Rivesville, Marion, West Virginia · Monongahela Power Co

Legacy capacity
110
MW

FirstEnergy Rivesville is a coal plant in Rivesville, Marion, West Virginia, retired 2012-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 110 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity110 MW
Retirement date2012-09-01
EIA plant ID#3945

Grid hookup & remediation

Nearest substation0.1 mi
Operator addressP.O.Box 190, Rivesville, WV, 26588
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Marion County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)13,770
IT / tech employment13
Construction employment731
Land value$3,858/acre

Power economics & interconnection

Commercial power rate10.92¢/kWh
Industrial power rate7.71¢/kWh
Load growth (FERC-714)0.2%

Water & cooling

Water stressLow
Public water supply8.2 MGD
Industrial water use0.0 MGD
Cooling degree days800
Mean annual temp52°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers5 · 47% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track FirstEnergy Rivesville

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near FirstEnergy Rivesville, ranked by DC Readiness.

Candidate sites near FirstEnergy Rivesville
SiteTypeStateCountyVoltageCapacityQueue waitScore
HARRISONSubstation-AdjacentWVHarrison County500 kV1,000 MW3.8 yrs71.4
PRUNTYTOWNSubstation-AdjacentWVTaylor County500 kV1,000 MW3.8 yrs70.2
FORT MARTINSubstation-AdjacentWVMonongalia County500 kV1,000 MW3.8 yrs67.2
UNKNOWN132844Substation-AdjacentWVMonongalia County500 kV1,000 MW3.8 yrs67.2
EC Coal Harrison CountyGreenfieldWVHarrison County——3.0 yrs65.9
EC Coal Harrison CountyGreenfieldWVHarrison County——3.0 yrs65.8
EC Coal Harrison CountyGreenfieldWVHarrison County——3.0 yrs65.5
HATFIELDSubstation-AdjacentPAGreene County500 kV1,000 MW3.8 yrs65.4

Nearby internet exchanges

See all datacenter sites in West Virginia →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for FirstEnergy Rivesville, Rivesville, Marion, West Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.