FirstEnergy Rivesville

Brownfield

Rivesville, Marion, West Virginia · Monongahela Power Co

Legacy capacity
110
MW

FirstEnergy Rivesville is a coal plant in Rivesville, Marion, West Virginia, retired 2012-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 110 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity110 MW
Retirement date2012-09-01
EIA plant ID#3945

Grid hookup & remediation

Nearest substation0.9 mi
OperatorMonongahela Power Co
Operator addressP.O.Box 190, Rivesville, WV, 26588
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near FirstEnergy Rivesville, ranked by DC Readiness.

Candidate sites near FirstEnergy Rivesville
SiteTypeStateCountyVoltageCapacityQueue waitScore
PRUNTYTOWNSubstation-AdjacentWVTaylor County500 kV1,000 MW3.0 yrs76.4
FORT MARTINSubstation-AdjacentWVMonongalia County500 kV1,000 MW3.0 yrs73.4
HARRISONSubstation-AdjacentWVHarrison County500 kV1,000 MW3.0 yrs73.2
UNKNOWN123487Substation-AdjacentWVPreston County500 kV1,000 MW3.0 yrs72.9
RONCOSubstation-AdjacentPAFayette County500 kV1,000 MW3.0 yrs72.9
UNKNOWN123481Substation-AdjacentWVMonongalia County500 kV1,000 MW3.0 yrs72.6
Greenfield (HARRISON - PRUNTYTOWN)GreenfieldWVTaylor County500 kV1,000 MW3.0 yrs71.9
Greenfield (HARRISON - BELMONT)GreenfieldWVHarrison County500 kV1,000 MW3.2 yrs71.8

Nearby internet exchanges

See all datacenter sites in West Virginia

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.