North Lake

Brownfield

Coppell, Dallas, Texas · Luminant Generation Company LLC

Legacy capacity
709
MW

North Lake is a natural gas plant in Coppell, Dallas, Texas, retired 2009-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 709 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity709 MW
Retirement date2009-05-01
EIA plant ID#3454

Grid hookup & remediation

Nearest substation0.1 mi
OperatorLuminant Generation Company LLC
Operator address14901 S. North Lake Rd, Coppell, TX, 75019
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near North Lake, ranked by DC Readiness.

Candidate sites near North Lake
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTHWEST CARROLLTONSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs75.0
NORWOODSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs74.5
SHERRYSubstation-AdjacentTXTarrant County345 kV600 MW3.4 yrs74.0
UNKNOWN308533Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs74.0
UNKNOWN302319Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.9
LEWISVILLE SWITCHSubstation-AdjacentTXDenton County345 kV600 MW3.4 yrs73.7
ALLEN SWITCHINGSubstation-AdjacentTXCollin County345 kV600 MW3.4 yrs73.6
UNKNOWN309031Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.5

Nearby internet exchanges

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for North Lake, Coppell, Dallas, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.