DFW Gas Recovery

Brownfield

Lewsiville, Denton, Texas · WM Renewable Energy LLC

Legacy capacity
12
MW

DFW Gas Recovery is a natural gas plant in Lewsiville, Denton, Texas, retired 2022-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity12 MW
Retirement date2022-11-01
EIA plant ID#50569

Grid hookup & remediation

Nearest substation0.6 mi
OperatorWM Renewable Energy LLC
Operator address1600 S. Railroad Street, Lewsiville, TX, 75067
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near DFW Gas Recovery, ranked by DC Readiness.

Candidate sites near DFW Gas Recovery
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTHWEST CARROLLTONSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs75.0
NORWOODSubstation-AdjacentTXDallas County345 kV600 MW3.4 yrs74.5
SHERRYSubstation-AdjacentTXTarrant County345 kV600 MW3.4 yrs74.0
UNKNOWN308533Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs74.0
UNKNOWN302319Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.9
LEWISVILLE SWITCHSubstation-AdjacentTXDenton County345 kV600 MW3.4 yrs73.7
ALLEN SWITCHINGSubstation-AdjacentTXCollin County345 kV600 MW3.4 yrs73.6
UNKNOWN309031Substation-AdjacentTXTarrant County345 kV600 MW3.4 yrs73.5

Nearby internet exchanges

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DFW Gas Recovery, Lewsiville, Denton, Texas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.