Skip to content
Gridcensus

Newgulf Cogen

Brownfield

NewGulf, Wharton, Texas · Wharton County Generation LLC

Legacy capacity
13
MW

Newgulf Cogen is a natural gas plant in NewGulf, Wharton, Texas, retired 2005-02-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 13 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity13 MW
Retirement date2005-02-01
EIA plant ID#50137

Grid hookup & remediation

Nearest substation0.0 mi
Operator address206 Vat Road #A, NewGulf, TX, 77420
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Wharton County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)13,580
Construction employment581
Land value$4,064/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate12.14¢/kWh
Industrial power rate7.35¢/kWh
Load growth (FERC-714)2.5%

Water & cooling

Water stressMedium-High
Public water supply3.7 MGD
Industrial water use0.0 MGD
Cooling degree days2,600
Mean annual temp65°F

Hazard, flood & connectivity

FEMA risk index55.0 · Very High
Fiber providers6 · 60% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Newgulf Cogen — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Jack Fusco Energy Centernatural gas plant40022.0 mi—
Imperial Power Plant LLCnatural gas plant1228.3 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Newgulf Cogen

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Newgulf Cogen, ranked by DC Readiness.

Candidate sites near Newgulf Cogen
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near Imperial Power Plant LLCGreenfieldTXFort Bend——3.4 yrs66.5
EC Near Jack Fusco Energy CenterGreenfieldTXFort Bend——3.4 yrs66.2
SMITHERSSubstation-AdjacentTXFort Bend County345 kV600 MW1.7 yrs66.2
EC Near Imperial Power Plant LLCGreenfieldTXFort Bend——3.4 yrs65.5
OZ Fort BendGreenfieldTXFort Bend——3.4 yrs64.6
Imperial Power Plant LLCBrownfieldTXFort Bend County138 kV12 MW3.4 yrs64.3
W.A. PARISH (138KV)Substation-AdjacentTXFort Bend County345 kV600 MW1.7 yrs64.3
EC Near Jack Fusco Energy CenterGreenfieldTXFort Bend——3.4 yrs63.8

Nearby internet exchanges

See all datacenter sites in Texas →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Newgulf Cogen, NewGulf, Wharton, Texas. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.