Jack Fusco Energy Center
BrownfieldThompsons, Fort Bend, Texas · Brazos Valley Energy
Jack Fusco Energy Center is a natural gas plant in Thompsons, Fort Bend, Texas. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 400 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Fort Bend County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Jack Fusco Energy Center — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Texas Petrochemicals | natural gas plant | 560 | 27.1 mi | — |
| Newgulf Cogen | natural gas plant | 13 | 22.0 mi | — |
| Imperial Power Plant LLC | natural gas plant | 12 | 10.2 mi | — |
| Bluebonnet | natural gas plant | 4 | 32.2 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Jack Fusco Energy Center
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Jack Fusco Energy Center, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC Near T H Wharton | Greenfield | TX | Harris | — | — | 3.4 yrs | 68.5 |
| BELLAIRE | Substation-Adjacent | TX | Harris County | 345 kV | 600 MW | 1.7 yrs | 67.7 |
| FRANZ | Substation-Adjacent | TX | Fort Bend County | 345 kV | 600 MW | 1.7 yrs | 67.6 |
| ADDICKS | Substation-Adjacent | TX | Harris County | 345 kV | 600 MW | 1.7 yrs | 67.4 |
| HILLCROFT | Substation-Adjacent | TX | Harris County | 345 kV | 600 MW | 1.7 yrs | 67.3 |
| OZ Harris | Greenfield | TX | Harris | — | — | 3.4 yrs | 67.3 |
| OZ Harris | Greenfield | TX | Harris | — | — | 3.4 yrs | 67.0 |
| OZ Harris | Greenfield | TX | Harris | — | — | 3.4 yrs | 66.7 |
Nearby internet exchanges
- Databank Houston West (HOU1) (HOU2)Houston, TX · 33 networks
- Netrality Houston - 1301 FanninHouston, TX · 29 networks
- TRG Datacenters Houston (HOU1) (HOU2)Spring, TX · 17 networks
- Digital Realty HOU (12001 North Freeway)Houston, TX · 14 networks
See all datacenter sites in Texas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen