Domain Integrated Energy System
BrownfieldAustin, Travis, Texas · Austin Energy
Domain Integrated Energy System is a natural gas plant in Austin, Travis, Texas, retired 2013-02-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Travis County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Domain Integrated Energy System — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Decker Creek | natural gas plant | 726 | 9.3 mi | — |
| Holly Street | natural gas plant | 558 | 10.2 mi | — |
| Hal C Weaver Power Plant | natural gas plant | 18 | 7.7 mi | — |
| GRS Sunset Farms | natural gas plant | 4 | 7.3 mi | — |
| Austin Gas Recovery | natural gas plant | 2 | 7.5 mi | — |
| Grove Landfill | former landfill site | — | 7.0 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Domain Integrated Energy System
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Domain Integrated Energy System, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| DECKER | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 1.7 yrs | 68.6 |
| EC Near Domain Integrated Energy System | Greenfield | TX | Travis | — | — | 3.4 yrs | 67.2 |
| EC Near Holly Street | Greenfield | TX | Travis | — | — | 3.4 yrs | 66.3 |
| Grove Landfill | Brownfield | TX | Travis | 138 kV | — | 1.7 yrs | 66.2 |
| UNKNOWN304304 | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 1.7 yrs | 66.1 |
| DESSAU | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 1.7 yrs | 65.9 |
| EC Near GRS Sunset Farms | Greenfield | TX | Travis | — | — | 3.4 yrs | 65.8 |
| DUNLAP | Substation-Adjacent | TX | Travis County | 345 kV | 600 MW | 1.7 yrs | 65.2 |
Nearby internet exchanges
- Data Foundry Texas 1Austin, TX · 15 networks
- CyrusOne Austin (Met 2)Austin, TX · 5 networks
- Element Critical Austin AUS1Austin, TX · 4 networks
- LightEdge Austin 2 (AUS2)Austin, TX · 4 networks
See all datacenter sites in Texas →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.