Decker Creek

Brownfield

Austin, Travis, Texas · Austin Energy

Legacy capacity
726
MW

Decker Creek is a natural gas plant in Austin, Travis, Texas, retired 2022-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 726 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity726 MW
Retirement date2022-03-01
EIA plant ID#3548

Grid hookup & remediation

Nearest substation0.0 mi
OperatorAustin Energy
Operator address8003 Decker Ln, Austin, TX, 78724
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Decker Creek, ranked by DC Readiness.

Candidate sites near Decker Creek
SiteTypeStateCountyVoltageCapacityQueue waitScore
DUNLAPSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs73.1
UNKNOWN304304Substation-AdjacentTXTravis County345 kV600 MW3.4 yrs72.4
ROUND ROCK NORTHEASTSubstation-AdjacentTXWilliamson County345 kV600 MW3.4 yrs72.1
PEDERNALESSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs71.5
DECKERSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs70.8
UNKNOWN306282Substation-AdjacentTXBastrop County345 kV600 MW3.4 yrs70.4
AUSTROPSubstation-AdjacentTXTravis County345 kV600 MW3.4 yrs70.0
MCNEILSubstation-AdjacentTXTravis County138 kV100 MW3.4 yrs69.6

Nearby internet exchanges

See all datacenter sites in Texas

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.