V C Summer
BrownfieldJenkinsville, Fairfield, South Carolina · Dominion Energy South Carolina, Inc
V C Summer is a nuclear plant in Jenkinsville, Fairfield, South Carolina. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2,200 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Fairfield County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near V C Summer — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Parr GT | natural gas plant | 84 | 2.5 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track V C Summer
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near V C Summer, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN152835 | Substation-Adjacent | SC | Richland County | 230 kV | 300 MW | 1.0 yrs | 70.5 |
| UNKNOWN117533 | Substation-Adjacent | SC | Richland County | 230 kV | 300 MW | 1.0 yrs | 70.4 |
| DEADEND167375 | Substation-Adjacent | SC | Lexington County | 230 kV | 300 MW | 1.0 yrs | 69.8 |
| UNKNOWN117827 | Substation-Adjacent | SC | Richland County | 230 kV | 300 MW | 1.0 yrs | 69.4 |
| DENNY TERRACE | Substation-Adjacent | SC | Richland County | 230 kV | 300 MW | 1.0 yrs | 69.3 |
| UNKNOWN117127 | Substation-Adjacent | SC | Fairfield County | 230 kV | 300 MW | 1.0 yrs | 69.2 |
| UNKNOWN117343 | Substation-Adjacent | SC | Richland County | 230 kV | 300 MW | 1.0 yrs | 69.0 |
| UNKNOWN117831 | Substation-Adjacent | SC | Lexington County | 230 kV | 300 MW | 1.0 yrs | 69.0 |
Nearby internet exchanges
- DartPoints Columbia, SC - CAE1Columbia, SC · 2 networks
See all datacenter sites in South Carolina →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for V C Summer, Jenkinsville, Fairfield, South Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.