V C Summer

Brownfield

Jenkinsville, Fairfield, South Carolina · Dominion Energy South Carolina, Inc

Legacy capacity
2,200
MW

V C Summer is a nuclear plant in Jenkinsville, Fairfield, South Carolina. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2,200 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenuclear plant
Site typeretired_plant
Existing capacity2,200 MW
EIA plant ID#6127

Grid hookup & remediation

Nearest substation0.6 mi
OperatorDominion Energy South Carolina, Inc
Operator addressBradham Boulevard off Hwy 215, Jenkinsville, SC, 29065
Why this site is datacenter-attractive: a nuclear plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near V C Summer, ranked by DC Readiness.

Candidate sites near V C Summer
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117533Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs72.1
UNKNOWN117539Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs70.8
DEADEND167376Substation-AdjacentSCFairfield County230 kV300 MW4.3 yrs69.9
UNKNOWN117831Substation-AdjacentSCLexington County230 kV300 MW4.3 yrs69.3
UNKNOWN157677Substation-AdjacentSCRichland County115 kV100 MW4.3 yrs68.8
UNKNOWN160652Substation-AdjacentSCLexington County115 kV100 MW4.3 yrs68.4
TAP152618Substation-AdjacentSCNewberry County230 kV300 MW4.3 yrs68.2
UNKNOWN152841Substation-AdjacentSCRichland County115 kV100 MW4.3 yrs68.0

Nearby internet exchanges

See all datacenter sites in South Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for V C Summer, Jenkinsville, Fairfield, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.