Faraday

Brownfield

Estacada, Clackamas, Oregon · Portland General Electric Co

Legacy capacity
17
MW

Faraday is a former hydro site in Estacada, Clackamas, Oregon, retired 2019-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 17 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity17 MW
Retirement date2019-05-01
EIA plant ID#3045

Grid hookup & remediation

Nearest substation0.0 mi
OperatorPortland General Electric Co
Operator address33831 Faraday Rd, Estacada, OR, 97023
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Faraday, ranked by DC Readiness.

Candidate sites near Faraday
SiteTypeStateCountyVoltageCapacityQueue waitScore
BPA TROUTDALESubstation-AdjacentORMultnomah County500 kV1,000 MW1.7 yrs78.2
MCLOUGHLINSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs74.3
GRESHAMSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs73.4
CARVERSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs72.6
SANTIAMSubstation-AdjacentORMarion County500 kV1,000 MW1.7 yrs72.2
SIFTONSubstation-AdjacentWAClark County230 kV300 MW1.7 yrs72.1
BLUE LAKESubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs71.9
NORTH BONNEVILLESubstation-AdjacentORHood River County230 kV300 MW1.7 yrs71.9

Nearby internet exchanges

See all datacenter sites in Oregon

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Faraday, Estacada, Clackamas, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.