Bull Run Hydro

Brownfield

Sandy, Clackamas, Oregon · Portland General Electric Co

Legacy capacity
21
MW

Bull Run Hydro is a former hydro site in Sandy, Clackamas, Oregon, retired 2008-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 21 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity21 MW
Retirement date2008-05-01
EIA plant ID#3044

Grid hookup & remediation

Nearest substation0.3 mi
OperatorPortland General Electric Co
Operator address13151 SE Bull Run Rd, Sandy, OR, 97055
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Bull Run Hydro, ranked by DC Readiness.

Candidate sites near Bull Run Hydro
SiteTypeStateCountyVoltageCapacityQueue waitScore
BPA TROUTDALESubstation-AdjacentORMultnomah County500 kV1,000 MW1.7 yrs78.2
MCLOUGHLINSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs74.3
GRESHAMSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs73.4
CARVERSubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs72.6
SIFTONSubstation-AdjacentWAClark County230 kV300 MW1.7 yrs72.1
BLUE LAKESubstation-AdjacentORMultnomah County230 kV300 MW1.7 yrs71.9
NORTH BONNEVILLESubstation-AdjacentORHood River County230 kV300 MW1.7 yrs71.9
TAP203169Substation-AdjacentORMultnomah County230 kV300 MW1.7 yrs71.1

Nearby internet exchanges

See all datacenter sites in Oregon

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Bull Run Hydro, Sandy, Clackamas, Oregon. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.