Enid

Brownfield

Enid, Garfield, Oklahoma · Oklahoma Gas & Electric Co

Legacy capacity
60
MW

Enid is a natural gas plant in Enid, Garfield, Oklahoma, retired 2012-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 60 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity60 MW
Retirement date2012-12-01
EIA plant ID#2950

Grid hookup & remediation

Nearest substation1.2 mi
OperatorOklahoma Gas & Electric Co
Operator address2318 Leona Mitchell Dr., Enid, OK, 73701
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Enid, ranked by DC Readiness.

Candidate sites near Enid
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN118692Substation-AdjacentOKGarfield County345 kV600 MW3.4 yrs70.5
WOODRINGSubstation-AdjacentOKGarfield County345 kV600 MW3.4 yrs70.3
UNKNOWN118692Substation-AdjacentOKGarfield County345 kV600 MW3.5 yrs69.2
UNKNOWN118880Substation-AdjacentOKGarfield County138 kV100 MW3.4 yrs66.9
UNKNOWN172484Substation-AdjacentOKGarfield County138 kV100 MW3.4 yrs66.8
UNKNOWN118363Substation-AdjacentOKGarfield County138 kV100 MW3.4 yrs66.5
TAP149214Substation-AdjacentOKGarfield County138 kV100 MW3.4 yrs66.4
ENIDSubstation-AdjacentOKGarfield County138 kV100 MW3.4 yrs65.7

See all datacenter sites in Oklahoma

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Enid, Enid, Garfield, Oklahoma. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.