Refuse & Coal

Brownfield

COLUMBUS, Franklin, Ohio · City of Columbus - (OH)

Legacy capacity
90
MW

Refuse & Coal is a former waste site in COLUMBUS, Franklin, Ohio, retired 1995-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 90 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer waste site
Site typeretired_plant
Existing capacity90 MW
Retirement date1995-12-01
EIA plant ID#312

Grid hookup & remediation

Nearest substation0.1 mi
Operator address2500 Jackson Pike, COLUMBUS, OH, 43223
Why this site is datacenter-attractive: a former waste site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Refuse & Coal, ranked by DC Readiness.

Candidate sites near Refuse & Coal
SiteTypeStateCountyVoltageCapacityQueue waitScore
CORRIDORSubstation-AdjacentOHDelaware County765 kV1,000 MW3.8 yrs70.6
UNKNOWN151647Substation-AdjacentOHDelaware County765 kV1,000 MW3.8 yrs68.1
HAYDENSubstation-AdjacentOHFranklin County345 kV600 MW3.8 yrs67.8
UNKNOWN113629Substation-AdjacentOHFranklin County345 kV600 MW3.8 yrs67.7
CORRIDORSubstation-AdjacentOHDelaware County345 kV600 MW3.8 yrs67.2
HYATTSubstation-AdjacentOHDelaware County345 kV600 MW3.8 yrs67.2
OZ FranklinGreenfieldOHFranklin3.2 yrs66.4
JUG STREETSubstation-AdjacentOHLicking County345 kV600 MW3.8 yrs66.3

Nearby internet exchanges

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Refuse & Coal, COLUMBUS, Franklin, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.