Bowling Green, Wood, Ohio · American Mun Power-Ohio, Inc

Legacy capacity
9
MW

Bowling Green is a oil plant in Bowling Green, Wood, Ohio, retired 2018-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 9 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity9 MW
Retirement date2018-08-01
EIA plant ID#7575

Grid hookup & remediation

Nearest substation3.4 mi
OperatorAmerican Mun Power-Ohio, Inc
Operator address901 Dunbridge Rd, Bowling Green, OH, 43402
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Bowling Green, ranked by DC Readiness.

Candidate sites near Bowling Green
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEMOYNESubstation-AdjacentOHWood County345 kV600 MW2.2 yrs78.8
LEMOYNESubstation-AdjacentOHWood County345 kV600 MW3.2 yrs77.0
FirstEnergy Bay ShoreBrownfieldOHLucas499 MW76.5
UNKNOWN171366Substation-AdjacentOHLucas County345 kV600 MW2.2 yrs76.4
UNKNOWN133807Substation-AdjacentOHFulton County345 kV600 MW3.2 yrs74.3
UNKNOWN113613Substation-AdjacentOHLucas County345 kV600 MW3.2 yrs74.3
UNKNOWN113830Substation-AdjacentOHLucas County345 kV600 MW3.2 yrs74.2
FOSTORIA CENTRAL SUBSTATIONSubstation-AdjacentOHHancock County345 kV600 MW3.2 yrs74.0

Nearby internet exchanges

See all datacenter sites in Ohio

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Bowling Green, Bowling Green, Wood, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.