W H Weatherspoon

Brownfield

Lumberton, Robeson, North Carolina · Duke Energy Progress - (NC)

Legacy capacity
166
MW

W H Weatherspoon is a coal plant in Lumberton, Robeson, North Carolina, retired 2011-09-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 166 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity166 MW
Retirement date2011-09-01
EIA plant ID#2716

Grid hookup & remediation

Nearest substation0.1 mi
OperatorDuke Energy Progress - (NC)
Operator address491 Power Plant Road, Lumberton, NC, 28358
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near W H Weatherspoon, ranked by DC Readiness.

Candidate sites near W H Weatherspoon
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114004Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs66.4
CUMBERLANDSubstation-AdjacentNCCumberland County500 kV1,000 MW4.3 yrs65.7
UNKNOWN112359Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs65.7
TAP146637Substation-AdjacentSCDillon County230 kV300 MW4.3 yrs65.2
UNKNOWN114104Substation-AdjacentNCCumberland County230 kV300 MW4.3 yrs65.1
TAP147236Substation-AdjacentNCColumbus County230 kV300 MW4.3 yrs64.7
TAP158331Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs64.5
UNKNOWN112294Substation-AdjacentNCColumbus County230 kV300 MW4.3 yrs64.5

See all datacenter sites in North Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for W H Weatherspoon, Lumberton, Robeson, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.