Riverbend

Brownfield

Mount Holly, Gaston, North Carolina · Duke Energy Carolinas, LLC

Legacy capacity
601
MW

Riverbend is a coal plant in Mount Holly, Gaston, North Carolina, retired 2013-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 601 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity601 MW
Retirement date2013-05-01
EIA plant ID#2732

Grid hookup & remediation

Nearest substation0.0 mi
OperatorDuke Energy Carolinas, LLC
Operator address175 Steamplant Rd, Mount Holly, NC, 28120
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Riverbend, ranked by DC Readiness.

Candidate sites near Riverbend
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.7 yrs81.1
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.5
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.0
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW4.3 yrs72.6
UNKNOWN114646Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.4
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.3
TAP169820Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.4
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.3

Nearby internet exchanges

See all datacenter sites in North Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Riverbend, Mount Holly, Gaston, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.