Morehead

Brownfield

Newport, Carteret, North Carolina · Duke Energy Progress - (NC)

Legacy capacity
16
MW

Morehead is a oil plant in Newport, Carteret, North Carolina, retired 2012-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 16 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity16 MW
Retirement date2012-10-01
EIA plant ID#2711

Grid hookup & remediation

Nearest substation0.3 mi
OperatorDuke Energy Progress - (NC)
Operator address212 Arthur Farm Road, Newport, NC, 28557
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Morehead, ranked by DC Readiness.

Candidate sites near Morehead
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP148457Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs63.0
MOREHEAD WILDWOODSubstation-AdjacentNCCarteret County230 kV300 MW4.3 yrs62.9
UNKNOWN111638Substation-AdjacentNCJones County230 kV300 MW4.3 yrs62.4
TAP148412Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs61.4
UNKNOWN148468Substation-AdjacentNCCraven County115 kV100 MW4.3 yrs60.7
TAP169638Substation-AdjacentNCCraven County115 kV100 MW4.3 yrs60.2
TAP148411Substation-AdjacentNCCraven County230 kV300 MW4.3 yrs59.5
CRAVEN COUNTY WOOD ENERGY LPSubstation-AdjacentNCCraven County230 kV300 MW4.3 yrs59.0

See all datacenter sites in North Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Morehead, Newport, Carteret, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.