International Paper Co. - New Bern Mill

Brownfield

New Bern, Craven, North Carolina · International Paper Co. - New Bern Mill

Legacy capacity
30
MW

International Paper Co. - New Bern Mill is a former biomass site in New Bern, Craven, North Carolina, retired 2014-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 30 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity30 MW
Retirement date2014-04-01
EIA plant ID#50188

Grid hookup & remediation

Nearest substation0.2 mi
Operator address1785 Weyerhaeuser Rd., New Bern, NC, 28563
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near International Paper Co. - New Bern Mill, ranked by DC Readiness.

Candidate sites near International Paper Co. - New Bern Mill
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ PittGreenfieldNCPitt4.3 yrs56.7
UNKNOWN111965Substation-AdjacentNCLenoir County230 kV300 MW3.8 yrs56.1
TAP172566Substation-AdjacentNCPitt County230 kV300 MW3.8 yrs55.6
TAP169874Substation-AdjacentNCPitt County230 kV300 MW3.8 yrs55.6
OZ CravenGreenfieldNCCraven4.3 yrs55.3
TAP148412Substation-AdjacentNCCraven County230 kV300 MW3.8 yrs55.1
UNKNOWN111441Substation-AdjacentNCCraven County230 kV300 MW3.8 yrs55.1
UNKNOWN111442Substation-AdjacentNCCraven County230 kV300 MW3.8 yrs55.1

See all datacenter sites in North Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for International Paper Co. - New Bern Mill, New Bern, Craven, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.