High Point, Jackson Lake

Brownfield

High Point, Guilford, North Carolina · North Carolina Mun Power Agny #1

Legacy capacity
2
MW

High Point, Jackson Lake is a oil plant in High Point, Guilford, North Carolina, retired 2007-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity2 MW
Retirement date2007-11-01
EIA plant ID#56058

Grid hookup & remediation

Nearest substation0.5 mi
OperatorNorth Carolina Mun Power Agny #1
Operator address1315 Jackson Lake Road, High Point, NC, 27263
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near High Point, Jackson Lake, ranked by DC Readiness.

Candidate sites near High Point, Jackson Lake
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114916Substation-AdjacentNCForsyth County230 kV300 MW4.3 yrs66.7
PLEASANT GARDENSubstation-AdjacentNCGuilford County500 kV1,000 MW4.3 yrs65.7
UNKNOWN115024Substation-AdjacentNCGuilford County230 kV300 MW4.3 yrs65.7
Greenfield (UNKNOWN114541 - PLEASANT GARDE)GreenfieldNCGuilford County500 kV1,000 MW4.3 yrs65.4
UNKNOWN115021Substation-AdjacentNCGuilford County230 kV300 MW4.3 yrs65.2
Greenfield (PLEASANT GARDEN - WOODLEAF SWI)GreenfieldNCRandolph County500 kV1,000 MW4.3 yrs64.1
UNKNOWN111010Substation-AdjacentNCStokes County230 kV300 MW4.3 yrs63.8
Lexington Hickory StreetBrownfieldNCDavidson2 MW63.0

See all datacenter sites in North Carolina

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for High Point, Jackson Lake, High Point, Guilford, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.