Fort Drum, Jefferson, New York · Black River Generation LLC

Legacy capacity
56
MW

ReEnergy Black River is a former biomass site in Fort Drum, Jefferson, New York, retired 2023-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 56 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer biomass site
Site typeretired_plant
Existing capacity56 MW
Retirement date2023-04-01
EIA plant ID#10464

Grid hookup & remediation

Nearest substation0.0 mi
Operator addressEuphrates RV Rd. & Oneida Ave., Fort Drum, NY, 13602
Why this site is datacenter-attractive: a former biomass site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Jefferson County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)29,278
Construction employment1,720
Land value$2,496/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate7.42¢/kWh
Industrial power rate3.98¢/kWh
Load growth (FERC-714)0.4%

Water & cooling

Water stressLow
Public water supply9.3 MGD
Industrial water use0.9 MGD
Cooling degree days700
Mean annual temp46°F

Hazard, flood & connectivity

FEMA risk index35.0 · Relatively High
Fiber providers9 · 20% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track ReEnergy Black River

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near ReEnergy Black River, ranked by DC Readiness.

Candidate sites near ReEnergy Black River
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN125628Substation-AdjacentNYLewis County230 kV300 MW4.9 yrs59.7
OZ JeffersonGreenfieldNYJefferson——3.5 yrs59.4
UNKNOWN124470Substation-AdjacentNYJefferson County115 kV100 MW4.9 yrs58.8
UNKNOWN125576Substation-AdjacentNYJefferson County115 kV100 MW4.9 yrs58.7
TAP139311Substation-AdjacentNYJefferson County115 kV100 MW4.9 yrs58.7
UNKNOWN130013Substation-AdjacentNYJefferson County115 kV100 MW4.9 yrs58.5
UNKNOWN125578Substation-AdjacentNYJefferson County115 kV100 MW4.9 yrs57.5
UNKNOWN125575Substation-AdjacentNYJefferson County115 kV100 MW4.9 yrs57.4

Nearby internet exchanges

See all datacenter sites in New York →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ReEnergy Black River, Fort Drum, Jefferson, New York. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.