City of Ogdensburg

Brownfield

Ogdensburg, New York

Legacy capacity
1
MW

City of Ogdensburg is a former mine site in Ogdensburg, New York. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer mine site
Site typeepa_brownfield
Existing capacity1 MW

Grid hookup & remediation

Nearest substation1.6 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former mine site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near City of Ogdensburg, ranked by DC Readiness.

Candidate sites near City of Ogdensburg
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (MASSENA - MARCY)GreenfieldNYSt. Lawrence County765 kV1,000 MW3.5 yrs63.4
Greenfield (MASSENA - MARCY)GreenfieldNYSt. Lawrence County765 kV1,000 MW3.5 yrs62.2
DUNN PAPERSubstation-AdjacentNYSt. Lawrence County115 kV100 MW3.5 yrs62.2
UNKNOWN125659Substation-AdjacentNYSt. Lawrence County115 kV100 MW3.5 yrs61.7
Greenfield (MASSENA - MARCY)GreenfieldNYSt. Lawrence County765 kV1,000 MW3.5 yrs61.7
OGDENSBURG POWERSubstation-AdjacentNYSt. Lawrence County115 kV100 MW3.5 yrs61.1
City of OgdensburgBrownfieldNYSt. Lawrence1 MW61.1
TAP140324Substation-AdjacentNYSt. Lawrence County115 kV100 MW3.5 yrs60.8

See all datacenter sites in New York

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for City of Ogdensburg, Ogdensburg, New York. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.