Missouri Avenue
BrownfieldAtlantic City, Atlantic, New Jersey · Calpine New Jersey Generation LLC
Missouri Avenue is a oil plant in Atlantic City, Atlantic, New Jersey, retired 2015-05-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 56 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Atlantic County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Missouri Avenue — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Cedar Station | oil plant | 67 | 24.3 mi | — |
| Stafford Park Solar Farm | former landfill site | 6 | 25.4 mi | cleanup_complete |
| Woodbine Landfill Plant | natural gas plant | 2 | 20.3 mi | — |
| Coastal Solar Carport | former brownfield site | 0 | 0.9 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Missouri Avenue
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Missouri Avenue, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Coastal Solar Carport | Brownfield | NJ | Atlantic | — | 0 MW | 3.8 yrs | 60.1 |
| UNKNOWN133191 | Substation-Adjacent | NJ | Ocean County | 230 kV | 300 MW | 3.8 yrs | 58.3 |
| Stafford Park Solar Farm | Brownfield | NJ | Ocean | 230 kV | 6 MW | 3.8 yrs | 57.0 |
| DENNIS STATION | Substation-Adjacent | NJ | Cape May County | 230 kV | 300 MW | 3.8 yrs | 56.8 |
| CARDIFF | Substation-Adjacent | NJ | Atlantic County | 230 kV | 300 MW | 3.8 yrs | 56.8 |
| OZ Atlantic | Greenfield | NJ | Atlantic | — | — | 2.6 yrs | 55.5 |
| EC Near Woodbine Landfill Plant | Greenfield | NJ | Cape May | — | — | 2.6 yrs | 55.0 |
| EC Near Missouri Avenue | Greenfield | NJ | Atlantic | — | — | 2.6 yrs | 54.8 |
See all datacenter sites in New Jersey →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Missouri Avenue, Atlantic City, Atlantic, New Jersey. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.