Campbell's Soup #1
BrownfieldCamden, New Jersey
Campbell's Soup #1 is a former manufacturing site in Camden, New Jersey. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Campbell's Soup #1 — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Eddystone Generating Station | coal plant | 707 | 12.6 mi | — |
| PSEG Burlington Generating Station | oil plant | 577 | 15.5 mi | — |
| Delaware Generating Station | oil plant | 315 | 2.4 mi | — |
| Schuylkill Generating Station | oil plant | 193 | 4.3 mi | — |
| Mickleton Station | natural gas plant | 71 | 11.4 mi | — |
| Chester Operations | oil plant | 67 | 14.8 mi | — |
| Fairless Hills | natural gas plant | 60 | 23.6 mi | — |
| Vicinity Energy Trenton, L.P. | natural gas plant | 15 | 26.5 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Campbell's Soup #1
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Campbell's Soup #1, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EDDYSTONE | Substation-Adjacent | PA | Delaware County | 230 kV | 300 MW | 3.8 yrs | 69.1 |
| WHITPAIN | Substation-Adjacent | PA | Montgomery County | 500 kV | 1,000 MW | 3.8 yrs | 68.7 |
| CENTERPOINT | Substation-Adjacent | PA | Montgomery County | 500 kV | 1,000 MW | 3.8 yrs | 68.4 |
| SCHUYLKILL | Substation-Adjacent | PA | Philadelphia County | 230 kV | 300 MW | 3.8 yrs | 68.2 |
| UNKNOWN130225 | Substation-Adjacent | DE | Delaware County | 230 kV | 300 MW | 3.8 yrs | 68.2 |
| ELROY | Substation-Adjacent | PA | Montgomery County | 500 kV | 1,000 MW | 3.8 yrs | 68.0 |
| BURLINGTON | Substation-Adjacent | NJ | Philadelphia County | 230 kV | 300 MW | 3.8 yrs | 67.5 |
| UNKNOWN128234 | Substation-Adjacent | DE | Delaware County | 230 kV | 300 MW | 3.8 yrs | 67.3 |
Nearby internet exchanges
- Netrality Philadelphia - 401 N BroadPhiladelphia, PA · 48 networks
- Equinix PH1 - PhiladelphiaPhiladelphia, PA · 20 networks
- Crown Castle Philadelphia (401 N Broad)Philadelphia, PA · 11 networks
- Quonix Datacenter (2401 Locust St)Philadelphia, PA · 7 networks
See all datacenter sites in New Jersey →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Campbell's Soup #1, Camden, New Jersey. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.