McGinness Hills

Brownfield

Austin, Lander, Nevada · Ormat Nevada Inc

Legacy capacity
12
MW

McGinness Hills is a former geothermal site in Austin, Lander, Nevada, retired 2023-08-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 12 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer geothermal site
Site typeretired_plant
Existing capacity12 MW
Retirement date2023-08-01
EIA plant ID#57446

Grid hookup & remediation

Nearest substation6.5 mi
OperatorOrmat Nevada Inc
Operator address1350 Grass Valley Road, Austin, NV, 89310
Why this site is datacenter-attractive: a former geothermal site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near McGinness Hills, ranked by DC Readiness.

Candidate sites near McGinness Hills
SiteTypeStateCountyVoltageCapacityQueue waitScore
AUSTINSubstation-AdjacentNVLander County230 kV300 MW5.8 yrs59.3
FRONTIERSubstation-AdjacentNVLander County230 kV300 MW5.8 yrs54.5
Greenfield (FRONTIER - UNKNOWN305563)GreenfieldNVLander County230 kV300 MW5.8 yrs53.8
Greenfield (FRONTIER - UNKNOWN305563)GreenfieldNVLander County230 kV300 MW5.8 yrs52.2
Greenfield (MACHACEK - FRONTIER)GreenfieldNVLander County230 kV300 MW5.8 yrs51.4
Greenfield (FRONTIER - UNKNOWN305563)GreenfieldNVLander County230 kV300 MW5.8 yrs50.5
Greenfield (AUSTIN - FRONTIER)GreenfieldNVLander County230 kV300 MW5.8 yrs49.9
Greenfield (MACHACEK - FRONTIER)GreenfieldNVLander County230 kV300 MW5.8 yrs47.6

See all datacenter sites in Nevada

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for McGinness Hills, Austin, Lander, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.