Empire

Brownfield

P.O. Box 135, Washoe, Nevada · USG Nevada LLC

Legacy capacity
5
MW

Empire is a former geothermal site in P.O. Box 135, Washoe, Nevada, retired 2011-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer geothermal site
Site typeretired_plant
Existing capacity5 MW
Retirement date2011-12-01
EIA plant ID#50760

Grid hookup & remediation

Nearest substation36.2 mi
OperatorUSG Nevada LLC
Operator addressP.O. Box 135, P.O. Box 135, NV, 89412
Why this site is datacenter-attractive: a former geothermal site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Empire, ranked by DC Readiness.

Candidate sites near Empire
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVWashoe County1000 kV1,000 MW5.8 yrs58.4
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVWashoe County1000 kV1,000 MW5.8 yrs57.7
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVWashoe County1000 kV1,000 MW5.8 yrs57.5
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVWashoe County1000 kV1,000 MW5.8 yrs57.4
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVStorey County1000 kV1,000 MW5.8 yrs56.6
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVWashoe County1000 kV1,000 MW5.8 yrs56.0
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVStorey County1000 kV1,000 MW5.8 yrs56.0
Greenfield (CELILO - SYLMAR EAST)GreenfieldNVWashoe County1000 kV1,000 MW5.8 yrs54.3

See all datacenter sites in Nevada

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Empire, P.O. Box 135, Washoe, Nevada. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.