Spencer Hydro

Brownfield

Spencer, Boyd, Nebraska · Nebraska Public Power District

Legacy capacity
2
MW

Spencer Hydro is a former hydro site in Spencer, Boyd, Nebraska, retired 2019-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity2 MW
Retirement date2019-03-01
EIA plant ID#2278

Grid hookup & remediation

Nearest substation0.0 mi
Operator address89566 492nd Ave, Spencer, NE, 68777
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Boyd County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)373
Construction employment8
Land value$2,664/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Load growth (FERC-714)0.7%

Water & cooling

Water stressMedium-High
Public water supply0.1 MGD
Industrial water use0.0 MGD
Cooling degree days1,000
Mean annual temp49°F

Hazard, flood & connectivity

FEMA risk index28.0 · Relatively Moderate
Fiber providers4 · 100% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Spencer Hydro

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Spencer Hydro, ranked by DC Readiness.

Candidate sites near Spencer Hydro
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORT RANDALLSubstation-AdjacentSDCharles Mix County230 kV300 MW3.3 yrs63.1
UNKNOWN131242Substation-AdjacentSDCharles Mix County115 kV100 MW3.3 yrs58.8
UNKNOWN159245Substation-AdjacentSDCharles Mix County69 kV50 MW3.3 yrs57.2
UNKNOWN131238Substation-AdjacentSDBoyd County115 kV100 MW3.3 yrs55.7
ONEILLSubstation-AdjacentNEHolt County115 kV100 MW3.3 yrs55.5
UNKNOWN132433Substation-AdjacentNEHolt County115 kV100 MW3.3 yrs55.4
UNKNOWN132464Substation-AdjacentNEHolt County115 kV100 MW3.3 yrs55.1
TAP134699Substation-AdjacentNEBoyd County115 kV100 MW3.3 yrs54.2

See all datacenter sites in Nebraska →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Spencer Hydro, Spencer, Boyd, Nebraska. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.