Rush Island

Brownfield

Festus, Jefferson, Missouri · Union Electric Co - (MO)

Legacy capacity
1,242
MW

Rush Island is a coal plant in Festus, Jefferson, Missouri, retired 2024-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1,242 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usecoal plant
Site typeretired_plant
Existing capacity1,242 MW
Retirement date2024-10-01
EIA plant ID#6155

Grid hookup & remediation

Nearest substation0.2 mi
OperatorUnion Electric Co - (MO)
Operator address100 Big Hollow Road, Festus, MO, 63028
Why this site is datacenter-attractive: a coal plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Rush Island, ranked by DC Readiness.

Candidate sites near Rush Island
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121749Substation-AdjacentILMonroe County345 kV600 MW4.6 yrs73.0
TURKEY HILLSubstation-AdjacentILSt. Clair County345 kV600 MW4.6 yrs71.9
TYSONSubstation-AdjacentMOSt. Louis County345 kV600 MW4.6 yrs70.2
TAP139428Substation-AdjacentMOJefferson County345 kV600 MW4.6 yrs69.8
TAP160053Substation-AdjacentILMonroe County345 kV600 MW4.6 yrs69.2
TAP139457Substation-AdjacentMOSt. Louis city138 kV100 MW4.6 yrs68.8
TAP139461Substation-AdjacentILMonroe County138 kV100 MW4.6 yrs68.2
TAP156135Substation-AdjacentILSt. Clair County138 kV100 MW4.6 yrs68.1

Nearby internet exchanges

See all datacenter sites in Missouri

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.