Red Bud
BrownfieldRed Bud, Randolph, Illinois · City of Red Bud - (IL)
Red Bud is a oil plant in Red Bud, Randolph, Illinois, retired 2001-10-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Randolph County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Red Bud — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Rush Island | coal plant | 1,242 | 15.5 mi | — |
| Meramec | coal plant | 1,041 | 22.3 mi | — |
| Baldwin Energy Complex | coal plant | 635 | 7.9 mi | — |
| Belleville Landfill Project | former landfill site | 13 | 20.7 mi | cleanup_complete |
| American Bottoms Solar Project | former power_plant site | 2 | 26.9 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Red Bud
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Red Bud, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| American Bottoms Solar Project | Brownfield | MO | St. Louis | 345 kV | 2 MW | 3.8 yrs | 70.2 |
| CAHOKIA | Substation-Adjacent | IL | St. Louis city | 345 kV | 600 MW | 3.8 yrs | 69.2 |
| BALDWIN STATION | Substation-Adjacent | IL | Randolph County | 345 kV | 600 MW | 3.8 yrs | 67.1 |
| TURKEY HILL | Substation-Adjacent | IL | St. Clair County | 345 kV | 600 MW | 3.8 yrs | 65.6 |
| Belleville Landfill Project | Brownfield | IL | St. Clair | 138 kV | 13 MW | 3.8 yrs | 65.4 |
| RUSH ISLAND | Substation-Adjacent | MO | Monroe County | 345 kV | 600 MW | 2.8 yrs | 64.6 |
| OZ St. Louis | Greenfield | MO | St. Louis | — | — | 1.4 yrs | 64.4 |
| OZ St. Louis | Greenfield | MO | St. Louis | — | — | 1.4 yrs | 63.4 |
Nearby internet exchanges
- Netrality St. Louis - 900 WalnutSt. Louis, MO · 42 networks
- Netrality St. Louis - 210 N TuckerSt. Louis, MO · 41 networks
- H5 Data Centers St. Louis (MO01)St. Louis, MO · 3 networks
- TierPoint St. Louis - WalnutSt. Louis, MO · 3 networks
See all datacenter sites in Illinois →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
Every site and score for Red Bud, Red Bud, Randolph, Illinois is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.