Kirksville
BrownfieldKirksville, Adair, Missouri · Union Electric Co - (MO)
Kirksville is a natural gas plant in Kirksville, Adair, Missouri, retired 2018-01-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 15 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Kirksville, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN117964 | Substation-Adjacent | MO | Adair County | 161 kV | 100 MW | 1.4 yrs | 64.8 |
| Greenfield (UNKNOWN117964 - THOMAS HILL) | Greenfield | MO | Macon County | 161 kV | 100 MW | 1.4 yrs | 59.7 |
| Greenfield (UNKNOWN117964 - APPANOOSE) | Greenfield | MO | Schuyler County | 161 kV | 100 MW | 1.4 yrs | 59.4 |
| OZ Sullivan | Greenfield | MO | Sullivan | — | — | 1.4 yrs | 59.0 |
| EC Near La Plata | Greenfield | MO | Macon | — | — | 1.4 yrs | 58.4 |
| Greenfield (UNKNOWN117964 - APPANOOSE) | Greenfield | MO | Schuyler County | 161 kV | 100 MW | 1.4 yrs | 58.2 |
| EC Near Kirksville | Greenfield | MO | Adair | — | — | 1.4 yrs | 57.8 |
| EC Near La Plata | Greenfield | MO | Macon | — | — | 1.4 yrs | 57.3 |
See all datacenter sites in Missouri →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Kirksville, Kirksville, Adair, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.