Howard Bend
BrownfieldChesterfield, St Louis, Missouri · Union Electric Co - (MO)
Howard Bend is a oil plant in Chesterfield, St Louis, Missouri, retired 2015-02-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 47 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near Howard Bend, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP139481 | Substation-Adjacent | MO | St. Louis city | 345 kV | 600 MW | 4.6 yrs | 75.9 |
| UNKNOWN117735 | Substation-Adjacent | MO | St. Louis city | 345 kV | 600 MW | 4.6 yrs | 75.0 |
| MASON | Substation-Adjacent | MO | St. Louis County | 345 kV | 600 MW | 4.6 yrs | 74.6 |
| CAHOKIA | Substation-Adjacent | MO | St. Louis city | 345 kV | 600 MW | 4.6 yrs | 73.4 |
| SIOUX | Substation-Adjacent | IL | Jersey County | 345 kV | 600 MW | 4.6 yrs | 72.6 |
| O'FALLON RENEWABLE ENERGY CENTER | Substation-Adjacent | MO | St. Charles County | 345 kV | 600 MW | 4.6 yrs | 71.3 |
| TAP153235 | Substation-Adjacent | MO | St. Charles County | 345 kV | 600 MW | 4.6 yrs | 70.9 |
| UNKNOWN117739 | Substation-Adjacent | MO | St. Louis city | 138 kV | 100 MW | 4.6 yrs | 70.9 |
Nearby internet exchanges
- Netrality St. Louis - 900 WalnutSt. Louis, MO · 42 networks
- Netrality St. Louis - 210 N TuckerSt. Louis, MO · 41 networks
- H5 Data Centers St. Louis (MO01)St. Louis, MO · 3 networks
- TierPoint St. Louis - WalnutSt. Louis, MO · 3 networks
See all datacenter sites in Missouri →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.