Delta (MS)

Brownfield

Cleveland, Bolivar, Mississippi · Entergy Mississippi LLC

Legacy capacity
225
MW

Delta (MS) is a natural gas plant in Cleveland, Bolivar, Mississippi, retired 2012-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 225 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity225 MW
Retirement date2012-12-01
EIA plant ID#2051

Grid hookup & remediation

Nearest substation0.1 mi
Operator address3964 Hwy 61, Cleveland, MS, 38732
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Bolivar County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)8,412
Construction employment271
Land value$4,310/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate14.22¢/kWh
Industrial power rate10.94¢/kWh
Load growth (FERC-714)0.9%

Water & cooling

Water stressLow
Public water supply4.2 MGD
Industrial water use0.8 MGD
Cooling degree days2,400
Mean annual temp64°F

Hazard, flood & connectivity

FEMA risk index45.0 · Relatively High
Fiber providers8 · 52% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Delta (MS)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Delta (MS), ranked by DC Readiness.

Candidate sites near Delta (MS)
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ SunflowerGreenfieldMSSunflower——1.4 yrs59.0
UNKNOWN111257Substation-AdjacentMSCoahoma County230 kV300 MW2.8 yrs59.0
INDIANOLASubstation-AdjacentMSSunflower County230 kV300 MW2.8 yrs58.1
UNKNOWN110697Substation-AdjacentMSWashington County230 kV300 MW2.8 yrs58.0
UNKNOWN110696Substation-AdjacentMSWashington County230 kV300 MW2.8 yrs57.9
UNKNOWN110700Substation-AdjacentMSWashington County230 kV300 MW2.8 yrs57.9
EC Near Third StreetGreenfieldMSCoahoma——1.4 yrs57.1
EC Near Delta (MS)GreenfieldMSBolivar——1.4 yrs56.2

See all datacenter sites in Mississippi →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Delta (MS), Cleveland, Bolivar, Mississippi. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.