UNKNOWN110697

Substation-Adjacent

Washington County, Mississippi · MISO

DC Readiness
58.0
Good / 100

UNKNOWN110697 is a substation-adjacent datacenter candidate site in Washington County, Mississippi, interconnecting through MISO. It screens at 58.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110697
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilityENTERGY MISSISSIPPI LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth59
Avg queue wait2.8 yrs

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance112.5 mi
Fiber providers5
Fiber coverage20.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score55/100

Location context

Nearest datacenterAmazon Canton Data Center
DC distance73.0 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.97¢/kWh
Industrial electricity10.49¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,488

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN110697

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
49
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
90
Natural hazard6%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
50
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
5

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near UNKNOWN110697
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110696Substation-Adjacent230 kV300 MW2.8 yrs57.9
UNKNOWN110695Substation-Adjacent230 kV300 MW2.8 yrs57.9
UNKNOWN110693Substation-Adjacent230 kV300 MW2.8 yrs57.9
UNKNOWN110700Substation-Adjacent230 kV300 MW2.8 yrs57.9
GERALD ANDRUS STATIONSubstation-Adjacent230 kV300 MW2.8 yrs57.8
UNKNOWN110692Substation-Adjacent230 kV300 MW2.8 yrs57.8
EC FFE Washington CountyGreenfield——1.4 yrs55.4
UNKNOWN110701Substation-Adjacent115 kV100 MW2.8 yrs53.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.