Legacy capacity
72
MW

Granite City is a natural gas plant in St. Cloud, Benton, Minnesota, retired 2019-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 72 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity72 MW
Retirement date2019-06-01
EIA plant ID#1910

Grid hookup & remediation

Nearest substation0.0 mi
Operator addressEast of Highway 10, St. Cloud, MN, 56301
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Benton County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)15,907
Construction employment2,471
Land value$5,147/acre
Datacenter tax incentivesales_tax_exemption

Power economics & interconnection

Commercial power rate12.45¢/kWh
Industrial power rate9.03¢/kWh
Load growth (FERC-714)0.7%

Water & cooling

Water stressLow
Public water supply2.1 MGD
Industrial water use0.0 MGD
Cooling degree days600
Mean annual temp42°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers6 · 45% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Granite City — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Sherburne Countycoal plant76518.0 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Granite City

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Granite City, ranked by DC Readiness.

Candidate sites near Granite City
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHERBURNE COUNTYSubstation-AdjacentMNSherburne County345 kV600 MW2.8 yrs66.9
MONTICELLOSubstation-AdjacentMNSherburne County345 kV600 MW2.8 yrs62.9
QUARRYSubstation-AdjacentMNStearns County345 kV600 MW2.8 yrs62.6
BENTONSubstation-AdjacentMNBenton County345 kV600 MW2.8 yrs62.0
EC Coal Wright CountyGreenfieldMNWright County——1.4 yrs60.8
EC Coal Benton CountyGreenfieldMNBenton County——1.4 yrs60.0
EC Near Sherburne CountyGreenfieldMNSherburne——1.4 yrs59.0
EC Near Sherburne CountyGreenfieldMNSherburne——1.4 yrs58.3

See all datacenter sites in Minnesota →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Granite City, St. Cloud, Benton, Minnesota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.