Twin Falls (MI)

Brownfield

Iron Mountain, Dickinson, Michigan · Wisconsin Electric Power Co

Legacy capacity
6
MW

Twin Falls (MI) is a former hydro site in Iron Mountain, Dickinson, Michigan, retired 2016-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity6 MW
Retirement date2016-07-01
EIA plant ID#1784

Grid hookup & remediation

Nearest substation0.0 mi
Operator addressN4211 County Road 607, Iron Mountain, MI, 49801
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Twin Falls (MI), ranked by DC Readiness.

Candidate sites near Twin Falls (MI)
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLAINSSubstation-AdjacentMIDickinson County345 kV600 MW3.8 yrs58.4
WHITE RAPIDS HYSubstation-AdjacentMIMarinette County138 kV100 MW3.8 yrs54.1
AMBERGSubstation-AdjacentWIMarinette County138 kV100 MW2.8 yrs54.0
EC FFE Dickinson CountyGreenfieldMIDickinson County2.2 yrs53.6
CHALK HILLS HYSubstation-AdjacentMIMenominee County138 kV100 MW3.8 yrs53.2
UNKNOWN129052Substation-AdjacentMIDickinson County138 kV100 MW3.8 yrs52.6
NORDICSubstation-AdjacentMIDickinson County138 kV100 MW3.8 yrs52.6
NIAGRA PAPER OF WISCONSINSubstation-AdjacentWIDickinson County138 kV100 MW2.8 yrs52.5

See all datacenter sites in Michigan

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Twin Falls (MI), Iron Mountain, Dickinson, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.