J C Weadock
BrownfieldEssexville, Bay, Michigan · Consumers Energy Co - (MI)
J C Weadock is a coal plant in Essexville, Bay, Michigan, retired 2016-04-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 331 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near J C Weadock, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| KARN | Substation-Adjacent | MI | Bay County | 345 kV | 600 MW | 2.2 yrs | 72.7 |
| TITTABAWASSEE | Substation-Adjacent | MI | Midland County | 345 kV | 600 MW | 2.2 yrs | 72.6 |
| BAUER | Substation-Adjacent | MI | Tuscola County | 345 kV | 600 MW | 2.2 yrs | 72.1 |
| UNKNOWN144603 | Substation-Adjacent | MI | Tuscola County | 345 kV | 600 MW | 2.2 yrs | 71.3 |
| TAP144602 | Substation-Adjacent | MI | Tuscola County | 345 kV | 600 MW | 2.2 yrs | 70.8 |
| HAMPTON | Substation-Adjacent | MI | Bay County | 345 kV | 600 MW | 2.2 yrs | 69.3 |
| UNKNOWN128499 | Substation-Adjacent | MI | Saginaw County | 345 kV | 600 MW | 2.2 yrs | 69.3 |
| Greenfield (BAUER - HAMPTON) | Greenfield | MI | Saginaw County | 345 kV | 600 MW | 2.2 yrs | 67.8 |
See all datacenter sites in Michigan →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for J C Weadock, Essexville, Bay, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.