Gaylord - Consumers
BrownfieldGaylord, Otsego, Michigan · Consumers Energy Co - (MI)
Gaylord - Consumers is a natural gas plant in Gaylord, Otsego, Michigan, retired 2018-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 80 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Otsego County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Gaylord - Consumers
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Gaylord - Consumers, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| LIVINGSTON | Substation-Adjacent | MI | Otsego County | 345 kV | 600 MW | 3.8 yrs | 61.1 |
| EC Near Tower | Greenfield | MI | Cheboygan | — | — | 2.2 yrs | 57.5 |
| EC Near Gaylord - Consumers | Greenfield | MI | Otsego | — | — | 2.2 yrs | 57.4 |
| EC Near Gaylord - Consumers | Greenfield | MI | Otsego | — | — | 2.2 yrs | 57.2 |
| UNKNOWN128920 | Substation-Adjacent | MI | Otsego County | 138 kV | 100 MW | 3.8 yrs | 57.0 |
| EC Near Gaylord - Consumers | Greenfield | MI | Otsego | — | — | 2.2 yrs | 56.2 |
| UNKNOWN128921 | Substation-Adjacent | MI | Otsego County | 138 kV | 100 MW | 3.8 yrs | 55.4 |
| UNKNOWN133923 | Substation-Adjacent | MI | Otsego County | 138 kV | 100 MW | 3.8 yrs | 55.4 |
See all datacenter sites in Michigan →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Gaylord - Consumers, Gaylord, Otsego, Michigan. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.