Dafter
BrownfieldDafter, Chippewa, Michigan · Cloverland Electric Co-op
Dafter is a oil plant in Dafter, Chippewa, Michigan, retired 2021-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Chippewa County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Get alerts
Track Dafter
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Dafter, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC Near Dafter | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 55.9 |
| EC FFE Chippewa County | Greenfield | MI | Chippewa County | — | — | 2.2 yrs | 55.6 |
| EC Near Dafter | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 55.5 |
| EC Near Dafter | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 55.5 |
| EC Near Dafter | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 54.9 |
| EC Near Dafter | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 53.8 |
| OZ Chippewa | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 53.8 |
| EC Near Dafter | Greenfield | MI | Chippewa | — | — | 2.2 yrs | 53.5 |
See all datacenter sites in Michigan →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Dafter, Dafter, Chippewa, Michigan. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.