Dafter

Brownfield

Dafter, Chippewa, Michigan · Cloverland Electric Co-op

Legacy capacity
6
MW

Dafter is a oil plant in Dafter, Chippewa, Michigan, retired 2021-12-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 6 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useoil plant
Site typeretired_plant
Existing capacity6 MW
Retirement date2021-12-01
EIA plant ID#1868

Grid hookup & remediation

Nearest substation0.0 mi
Operator address2535 W M-28, Dafter, MI, 49724
Why this site is datacenter-attractive: a oil plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Chippewa County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)6,489
Construction employment554
Land value$2,840/acre
Datacenter tax incentiveproperty_tax_exemption

Power economics & interconnection

Commercial power rate12.03¢/kWh
Industrial power rate8.82¢/kWh
Load growth (FERC-714)0.5%

Water & cooling

Water stressLow
Public water supply2.7 MGD
Industrial water use0.8 MGD
Cooling degree days700
Mean annual temp45°F

Hazard, flood & connectivity

FEMA risk index25.0 · Relatively Moderate
Fiber providers5 · 24% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Dafter

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Dafter, ranked by DC Readiness.

Candidate sites near Dafter
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near DafterGreenfieldMIChippewa——2.2 yrs55.9
EC FFE Chippewa CountyGreenfieldMIChippewa County——2.2 yrs55.6
EC Near DafterGreenfieldMIChippewa——2.2 yrs55.5
EC Near DafterGreenfieldMIChippewa——2.2 yrs55.5
EC Near DafterGreenfieldMIChippewa——2.2 yrs54.9
EC Near DafterGreenfieldMIChippewa——2.2 yrs53.8
OZ ChippewaGreenfieldMIChippewa——2.2 yrs53.8
EC Near DafterGreenfieldMIChippewa——2.2 yrs53.5

See all datacenter sites in Michigan →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Dafter, Dafter, Chippewa, Michigan. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.