Cadillac Renewable Energy
BrownfieldCadillac, Wexford, Michigan · Cadillac Renewable Energy LLC
Cadillac Renewable Energy is a former biomass site in Cadillac, Wexford, Michigan, retired 2020-02-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 44 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Wexford County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Cadillac Renewable Energy — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Mitchell-Bentley | former manufacturing site | 1 | 1.6 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Cadillac Renewable Energy
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Cadillac Renewable Energy, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| EC FFE Wexford County | Greenfield | MI | Wexford County | — | — | 2.2 yrs | 57.7 |
| Mitchell-Bentley | Brownfield | MI | Wexford | — | 1 MW | 2.8 yrs | 56.5 |
| EC Near George Johnson | Greenfield | MI | Osceola | — | — | 2.2 yrs | 56.5 |
| EC FFE Missaukee County | Greenfield | MI | Missaukee County | — | — | 2.2 yrs | 55.8 |
| UNKNOWN145744 | Substation-Adjacent | MI | Wexford County | 138 kV | 100 MW | 3.8 yrs | 55.6 |
| EC Near George Johnson | Greenfield | MI | Osceola | — | — | 2.2 yrs | 55.2 |
| EC FFE Lake County | Greenfield | MI | Lake County | — | — | 2.2 yrs | 54.9 |
| CHASE | Substation-Adjacent | MI | Lake County | 138 kV | 100 MW | 3.8 yrs | 54.7 |
See all datacenter sites in Michigan →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.