B E Morrow
BrownfieldComstock, Kalamazoo, Michigan · Consumers Energy Co - (MI)
B E Morrow is a natural gas plant in Comstock, Kalamazoo, Michigan, retired 2014-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 36 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near B E Morrow, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ARGENTA | Substation-Adjacent | MI | Kalamazoo County | 345 kV | 600 MW | 2.2 yrs | 73.7 |
| TAP138973 | Substation-Adjacent | MI | Cass County | 345 kV | 600 MW | 2.2 yrs | 73.6 |
| WEEDS LAKE | Substation-Adjacent | MI | Kalamazoo County | 345 kV | 600 MW | 2.2 yrs | 73.0 |
| Greenfield (TAP138973 - ARGENTA) | Greenfield | MI | Cass County | 345 kV | 600 MW | 2.2 yrs | 71.8 |
| FLOWERFIELD | Substation-Adjacent | MI | St. Joseph County | 138 kV | 100 MW | 2.2 yrs | 71.8 |
| TAP141281 | Substation-Adjacent | MI | Kalamazoo County | 138 kV | 100 MW | 2.2 yrs | 71.8 |
| UNKNOWN128778 | Substation-Adjacent | MI | Kalamazoo County | 138 kV | 100 MW | 2.2 yrs | 71.4 |
| TAP145702 | Substation-Adjacent | MI | St. Joseph County | 138 kV | 100 MW | 2.2 yrs | 71.3 |
Nearby internet exchanges
- 123.NET - DC4 - 400 76th St SWByron Center, MI · 11 networks
- ManagedWay BYK1Byron Center, MI · 2 networks
- US Signal - Grand Rapids SouthByron Center, MI · 2 networks
- Aunalytics Kalamazoo DatacenterKalamazoo, MI · 1 networks
See all datacenter sites in Michigan →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for B E Morrow, Comstock, Kalamazoo, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.