B E Morrow
BrownfieldComstock, Kalamazoo, Michigan · Consumers Energy Co - (MI)
B E Morrow is a natural gas plant in Comstock, Kalamazoo, Michigan, retired 2014-03-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 36 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Site conditions & market — Kalamazoo County
County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.
Market & workforce
Power economics & interconnection
Water & cooling
Hazard, flood & connectivity
County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near B E Morrow — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| Battle Creek Mill | natural gas plant | 1 | 15.0 mi | — |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track B E Morrow
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near B E Morrow, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| WEEDS LAKE | Substation-Adjacent | MI | Kalamazoo County | 345 kV | 600 MW | 3.8 yrs | 65.4 |
| ARGENTA | Substation-Adjacent | MI | Kalamazoo County | 345 kV | 600 MW | 3.8 yrs | 64.8 |
| OZ Kalamazoo | Greenfield | MI | Kalamazoo | — | — | 2.2 yrs | 62.7 |
| BATTLE CREEK | Substation-Adjacent | MI | Calhoun County | 345 kV | 600 MW | 3.8 yrs | 62.0 |
| EC Near B E Morrow | Greenfield | MI | Kalamazoo | — | — | 2.2 yrs | 61.9 |
| UNKNOWN128711 | Substation-Adjacent | MI | Kalamazoo County | 138 kV | 100 MW | 3.8 yrs | 60.8 |
| EC Near B E Morrow | Greenfield | MI | Kalamazoo | — | — | 2.2 yrs | 60.7 |
| TAP141281 | Substation-Adjacent | MI | Kalamazoo County | 138 kV | 100 MW | 3.8 yrs | 60.7 |
Nearby internet exchanges
- 123.NET - DC4 - 400 76th St SWByron Center, MI · 11 networks
- ManagedWay BYK1Byron Center, MI · 2 networks
- US Signal - Grand Rapids SouthByron Center, MI · 2 networks
- Aunalytics Kalamazoo DatacenterKalamazoo, MI · 1 networks
See all datacenter sites in Michigan →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for B E Morrow, Comstock, Kalamazoo, Michigan. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.