Silver Lake Solar Photovoltaic Facility
BrownfieldPittsfield, Massachusetts
Silver Lake Solar Photovoltaic Facility is a former superfund site in Pittsfield, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby brownfield & retired-generation sites
A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Silver Lake Solar Photovoltaic Facility — the environmental neighborhood, ranked by legacy grid capacity.
| Site | Former use | Legacy MW | Distance | Cleanup status |
|---|---|---|---|---|
| North Adams Landfill | former landfill site | 4 | 17.7 mi | cleanup_complete |
| Williams College - Campus CHP | oil plant | 3 | 18.1 mi | — |
| Pittsfield Municipal Landfill | former landfill site | 3 | 0.0 mi | cleanup_complete |
Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.
Get alerts
Track Silver Lake Solar Photovoltaic Facility
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Silver Lake Solar Photovoltaic Facility, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ALPS | Substation-Adjacent | NY | Rensselaer County | 345 kV | 600 MW | 4.9 yrs | 61.8 |
| EASTOVER | Substation-Adjacent | NY | Rensselaer County | 230 kV | 300 MW | 4.9 yrs | 61.2 |
| BERKSHIRE | Substation-Adjacent | MA | Berkshire County | 345 kV | 600 MW | 3.9 yrs | 58.9 |
| UNKNOWN124125 | Substation-Adjacent | NY | Rensselaer County | 115 kV | 100 MW | 4.9 yrs | 57.0 |
| TAP135826 | Substation-Adjacent | NY | Rensselaer County | 115 kV | 100 MW | 4.9 yrs | 56.9 |
| TAP135824 | Substation-Adjacent | NY | Rensselaer County | 115 kV | 100 MW | 4.9 yrs | 56.8 |
| UNKNOWN128944 | Substation-Adjacent | NY | Columbia County | 115 kV | 100 MW | 4.9 yrs | 56.8 |
| BEAR SWAMP | Substation-Adjacent | MA | Franklin County | 230 kV | 300 MW | 3.9 yrs | 56.8 |
Nearby internet exchanges
- Cogent AlbanyAlbany, NY · 6 networks
- INOC Albany (80 State St)Albany, NY · 3 networks
- INOC Albany (11 North Pearl St)Albany, NY · 2 networks
- INOC Albany (4 Tower Pl)Albany, NY · 1 networks
See all datacenter sites in Massachusetts →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Silver Lake Solar Photovoltaic Facility, Pittsfield, Massachusetts. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.