New Bedford High School Solar
BrownfieldNew Bedford, Massachusetts
New Bedford High School Solar is a former brownfield site in New Bedford, Massachusetts. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 1 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Nearby datacenter candidate sites
Scored candidate sites near New Bedford High School Solar, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ANP BELLINGHAM ENERGY PROJECT | Substation-Adjacent | MA | Norfolk County | 345 kV | 600 MW | 3.5 yrs | 72.9 |
| FALL RIVER | Substation-Adjacent | RI | Bristol County | 345 kV | 600 MW | 3.5 yrs | 68.8 |
| UNKNOWN136319 | Substation-Adjacent | RI | Providence County | 115 kV | 100 MW | 3.5 yrs | 68.6 |
| UNKNOWN133428 | Substation-Adjacent | MA | Plymouth County | 345 kV | 600 MW | 3.5 yrs | 68.1 |
| NORTH ATTLEBORO | Substation-Adjacent | MA | Norfolk County | 115 kV | 100 MW | 3.5 yrs | 66.9 |
| PAWTUCKET | Substation-Adjacent | RI | Bristol County | 115 kV | 100 MW | 3.5 yrs | 65.8 |
| MINK STREET | Substation-Adjacent | RI | Bristol County | 115 kV | 100 MW | 3.5 yrs | 65.7 |
| Greenfield (BERRY STREET - FALL RIVER (345) | Greenfield | MA | Norfolk County | 345 kV | 600 MW | 3.5 yrs | 65.7 |
Nearby internet exchanges
- Prov.net PVD2 (304 Carpenter)Providence, RI · 5 networks
- Crown Castle Providence (235 Promenade)Providence, RI · 3 networks
- Prov.net PVD1 (1155 Westminster)Providence, RI · 2 networks
- ColoSpace - Rockland, MARockland, MA · 1 networks
See all datacenter sites in Massachusetts →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for New Bedford High School Solar, New Bedford, Massachusetts. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.